For Individuals and Companies

Build your information technology infrastructure through the systems that are trusted by more than 20 million customers around the world.

Domain names | Domain Name Bulk Registration | Domain Transfer | Bulk Transfer | Domain Backorder | Websites | Website Builder | Hosting | cPanel | Plesk | WordPress | Web Hosting Plus | VPS | Dedicated Server | Professional Email | SSL | Managed SSL Service | Website Backup | Email Marketing | SEO |

Standard Contractors Group offers Emergency Tech Support for Houses of Worship. Call (743) 220 7848

  • Modern Lightning

    Modern Lighting 7
  • Hurricane Information

  • SpyFinder Pro Hidden Camera Detector

    SpyFinder Pro Hidden Camera Detector
  • Air Quality Index - - Crystal Lake, IL

  • Framed Art

    Shop FramedArt.com Today!
  • Audio Listening Support



    Do You Need a Media Player?


    If your Smart Phone or Tablet cannot play some of our audio files you may need to add a media player.

    Many media players are free (you just download and install them). Google's Play Store ( https://play.google.com/store ) often has many free media players available for download.

    Searching for media players on most major search engines will return a number of media player options. Suggested search terms are as follows:

    "Free media players for Android"

    "Free media players for IOS"

    "Free media players for Smart Phones"

    "Free media players for tablets"

    Note: To avoid viruses, we recommend downloading from trusted sites only.

    Enjoy our audio programs!

  • Gem & Harmony

    Black Friday 25% Off - Gem And Harmony
  • Stream 173-94



    Mixed Link



    BroadWave Streaming Audio Server v1.10 © NCH Software NCH
  • Audio Options for Various Devices

  • Air Quality Conditions in Fairbanks, AK Zip Code 99701

  • Stream 173-85



    Mixed Link



    BroadWave Streaming Audio Server v1.10 © NCH Software NCH
  • Come

    Come unto me, all ye that labour and are heavy laden, and I will give you rest. (Matthew 11:28 - - - The Holy Bible) * * * * * * * God loves you!!!
  • ShelterLogic

    Lake Life
  • National Hurricane Center

  • tasc sleepwear

    sleepwear launch
  • Federal Railroad Administration Awards more than 46 Million Dollars for Positive Train Control Implementation

    Federal Railroad Administration Awards more than $46 Million for Positive Train Control Implementation
    Recent news from 2018

    11 projects in 10 states receive funding in second round of FY 2018 PTC grants


    Washington, DC - - (December 21, 2018) - - Today, the Federal Railroad Administration published the following information:

    The Federal Railroad Administration (FRA) today awarded $46,301,702 in grant funding for 11 projects in 10 states to assist with deploying positive train control (PTC) systems. This marks the second selection of PTC systems deployment projects under the Fiscal Year (FY) 2018 Consolidated Appropriations Act and via the Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program, collectively totaling $250 million in funding.

    “These $46 million in grants will speed up the deployment of Positive Train Control systems, a key element in strengthening safety for both passenger and freight railroads,” U.S. Transportation Secretary Elaine L. Chao said. “Each recipient will be held accountable for achieving specific, measurable outcomes.”

    The CRISI Program was authorized by the Fixing America’s Surface Transportation (FAST) Act to provide funding to improve the safety, efficiency, and reliability of intercity passenger rail and freight rail transportation systems. The FY 2018 Consolidated Appropriations Act provided $592,547,000 for the CRISI Program, with $250,000,000 to be made available for PTC system deployment. On August 24, 2018, FRA announced $203.7 million in grant awards for PTC implementation to 28 projects in 15 states.

    “These grants not only help railroads continue to make progress implementing positive train control, but they also show that we’re steadfast in our commitment to make investments in passenger rail and rural communities,” said FRA Administrator Ronald L. Batory.

    In this second round of FY 2018 PTC CRISI grants, 100 percent of the funds will benefit passenger rail, with about 31 percent – or $14 million – benefiting rural projects. The CRISI grant program directs much-needed critical investment – at least 25 percent of available funds – to rural America.

    The awards will fund many aspects of PTC system implementation for intercity passenger or commuter rail and freight rail transportation, including back office PTC systems; wayside, communications, and onboard PTC system equipment; personnel training; PTC system testing; and interoperability.

    In 2008, Congress mandated implementation of PTC systems on the main lines of Class I railroads and entities providing regularly scheduled intercity or commuter rail passenger transportation over which hazardous materials are transported, or over which intercity or commuter rail passenger transportation is regularly provided. In October 2015, Congress extended the original PTC system implementation deadline from December 31, 2015, to December 31, 2018. In addition, Congress requires FRA to approve a railroad’s request for an “alternative schedule” with a deadline for full implementation beyond December 31, 2018, but not later than December 31, 2020, if the railroad demonstrates it has met the congressionally mandated criteria for an alternative schedule.

    FRA awarded grants in the approximate amounts below to the following programs and entities:


    • AK – GPS Precision Upgrade for PTC (Up to $2,530,618)
      Alaska Railroad Corporation (ARRC)

      • For this rural project, ARRC will procure a platform with software to improve the accuracy and functionality of the global positioning system (GPS) in ARRC’s locomotives and on-track equipment, and implement the vital functions for its Interoperable Electronic Train Management System (I-ETMS).

    • CA – PTC Configuration Management and Office Segment Failover (Up to $3,976,560)
      Peninsula Corridor Joint Powers Board (Caltrain)
    • To implement Caltrain’s I-ETMS PTC system, this grant will fund the completion of a Caltrain PTC Configuration Management (CM) Plan and PTC Data Management Procedure; development of a CM tool that generates an audit trail for changes to configuration data and CM training on the configuration control and CM process; completion of the backup central control facility (BCCF) and Central Control Facility Failover Design and Test Plan; and completion of the design, test results, and as-built system for an Emergency Operation Center at the existing BCCF in Menlo Park, Calif.
    • This project will include a study for leveraging PTC to increase capacity and reduce headways, software development, PTC component upgrades, and/or corridor infrastructure upgrades to support the future implementation of Higher Reliability and Capacity Train Control (HRCTC) along Metrolink’s congested Orange County Line from Los Angeles Union Station to Oceanside, Calif.
    • This rural project from CDOT, in collaboration with the Kansas Department of Transportation (KDOT) and BNSF, includes the design, installation, and testing of I-ETMS PTC wayside technology on approximately 179 miles of a predominantly single-track route between Dodge City, Kan., and Las Animas, Colo.
    • The project includes purchasing and installing onboard I-ETMS PTC equipment on Metra’s 24 recently purchased locomotives.
    • This project on the Needham Branch, Franklin Branch, and Worcester Line, includes two components: 1) Testing of Automatic Train Control (ATC), where the previously installed PTC/ATC equipment on each line is already wired, and the software is loaded, connected to the signal system, and activated. The testing is intended to confirm the equipment functions as designed and is ready for testing with a test train. 2) “Completion of Commissioning for the ATC Lines,” where final acceptance testing is performed, including interoperability and ATC system testing.
    • The project includes installing, testing, commissioning, and certifying I-ETMS PTC onboard technology on three NCDOT locomotives for operation in the Piedmont intercity passenger rail service, which operates between Raleigh and Charlotte, N.C.
    • This project will install and test Advanced Speed Enforcement System II (ASES II) PTC onboard equipment on 33 new NJT multilevel cab cars for deployment along the Northeast Corridor, Montclair-Boonton, and Morris & Essex Lines in New Jersey.
    • This rural project will restore the New Mexico Rail Runner Express (NMRX) system’s Wi-Fi network from an end-of-life, proprietary WiMAX system to a cross-compatible Long-Term Evolution (LTE) system, providing a redundant path of communication for its I-ETMS PTC system. The project will install 26 towers along the 96 miles of the NMRX system between Belen, N.M. and Santa Fe, N.M., including approximately 74 miles of the Albuquerque Subdivision and 22 miles of the Santa Fe Subdivision. Nine NMRX cab cars, 13 coach cars, and 15 NMRX stations will be equipped with the Wi-Fi technology necessary for its PTC system.
    • This project will involve PTC system testing to measure communications system performance to predict, identify, and replicate communications issues affecting MTA’s Metro-North Railroad’s operations, as well as develop and validate mitigation approaches to address communications challenges along the Northeast Corridor.
    • This project includes the design, installation, and verification of the Enhanced Automatic Train Control PTC wayside system on the new tracks along Capital Metro’s Red Line in the cities of Austin, Cedar Park, Leander, and the surrounding Texas communities. The new project spans a 21-mile section along the Red Line on Capital Metro’s commuter rail corridor.
    • CA – Leveraging PTC to Increase Capacity and Reduce Headways and Alternative Vendor Analysis (Up to $3,150,000)
      Southern California Regional Rail Authority (SCRRA or Metrolink)
    • CO – PTC Installation for the Amtrak Southwest Chief on BNSF Railway Through Colorado and Kansas (Up to $9,157,600)
      Colorado Department of Transportation (CDOT)
    • IL – PTC Kits and Spare Parts for 24 Additional Locomotives at Metra (Up to $2,058,163)
      Commuter Rail Division of the Regional Transportation Authority (Metra)
    • MA – MBTA PTC Implementation (Up to $7,548,335)
      Massachusetts Bay Transportation Authority (MBTA)
    • NC – NCDOT Rolling Stock PTC Commissioning (Up to $584,080)
      North Carolina Department of Transportation (NCDOT)
    • NJ – PTC Installation on Multilevel Cab Cars (Up to $6,542,353)
      New Jersey Transit Corporation (NJT)
    • NM – New Mexico Rail Runner Express PTC/Wi-Fi Integration Project (Up to $2,496,842)
      Rio Metro Regional Transit District (Rio Metro)
    • NY – MTA Metro-North Railroad PTC Communications Testing (Up to $2,300,000)
      NY Metropolitan Transportation Authority (MTA)
    • TX – Capital Metro E-ATC PTC Wayside Installation Project (Up to $5,957,151)

    Capital Metropolitan Transportation Authority (Capital Metro)

    • This project includes the design, installation, and verification of the Enhanced Automatic Train Control PTC wayside system on the new tracks along Capital Metro’s Red Line in the cities of Austin, Cedar Park, Leander, and the surrounding Texas communities. The new project spans a 21-mile section along the Red Line on Capital Metro’s commuter rail corridor.




    Credit: Federal Railroad Administration
  • Horne

    Horne Nelson Bubble Lamps Sale 15% OFF May 3rd - 15th - 300X600.
  • Hurricane Information

  • Air Quality Index - - State College, PA

  • Sections Directory

  • Computer Repair

    Computer issues and/or problems? Get help
  • Stream 1605

    Stream 1605




    Opt 1  |  Opt 2  |  Opt 3  |    More




  • BEWARE OF CULTS

    <B>Beware of Cults</B>

    BEWARE OF CULTS!!!


    IF YOUR FAMILY MEMBER IS IN AN ORGANIZATION THAT WILL NOT ALLOW HIM OR HER TO TALK TO HIS OR HER RELATIVES, THAT PERSON IS IN A CULT!!!

    CULT LEADERS ARE MEAN, HARD-HEARTED AND EVIL!!!

    BEWARE OF CULTS!!!

    CULTS BRAINWASH ADULTS!!!

    SOME CULTS OPERATE IN THE ATLANTA, GEORGIA AREA!!!

    CULTS ALSO OPERATE IN OTHER AREAS!!!

    IF, WHEN YOUR FAMILY MEMBER DOES CONTACT A MEMBER OF THE FAMILY, THE FAMILY MEMBER CONTACTED IS NOT ALLOWED TO TALK, YOUR FAMILY MEMBER IS IN A CULT!!!

    CULT LEADERS ARE MEAN, HARD-HEARTED AND EVIL!!!

    ANYONE WHO WILL NOT ALLOW A PERSON TO TALK TO HIS OR HER OWN PARENTS IS MEAN, HARD-HEARTED AND EVIL!!!

    IF, WHEN YOU INQUIRE ABOUT YOUR FAMILY MEMBER, THEY ACCUSE YOU OF STALKING, YOUR FAMILY MEMBER IS IN A CULT!!!

    BEWARE OF CULTS!!!



    YOU HAVE BEEN WARNED!!!

    BEWARE OF CULTS!!!

  • Spy Associates #1

    Spy Associates #1 Spy Shop For All Your Surveillance Needs Since 1999
  • Stream 173-89



    Mixed Link



    BroadWave Streaming Audio Server v1.10 © NCH Software NCH
  • Air Quality Conditions in Fort Wayne, IN Zip Code 46835

  • Latest CMS Content